· Orqestra Team · 6 min read

What Is a Good Prime Cost for a Restaurant?

Prime cost is food and beverage cost plus total labor. Get the formula, 2026 benchmarks for full service and quick service, and a worked monthly example.

A good prime cost for a restaurant is about 60% of sales or lower. Full-service restaurants usually land between 60% and 65%, quick-service restaurants between 55% and 60%, and the best-run independents push toward 55%. Prime cost is your cost of goods sold (food, beverage, and paper) plus your total labor cost, including payroll taxes and benefits, divided by total sales.

Those two line items are the only big costs you control week to week. Rent is fixed. Insurance is fixed. Prime cost is where the money is made or lost, which is why it is the first number most restaurant accountants ask for.

What prime cost is and what goes into it

Prime cost has two halves.

Cost of goods sold (COGS) is everything you bought that ended up on a plate or in a glass: food, beer, wine, liquor, non-alcoholic beverages, and usually paper goods like to-go containers. It is calculated from inventory, not from invoices alone:

COGS = beginning inventory + purchases - ending inventory

Total labor is everyone who works in the building, fully loaded. Restaurant365 defines it as total wages plus payroll taxes, benefits, and insurance. 7shifts lists the same pieces: hourly wages, salaried manager pay, payroll taxes, workers' comp, and benefits for everyone on the team.

What stays out: rent, utilities, insurance, marketing, repairs, loan payments, and credit card fees. Those are real costs, but they are either fixed or tied to sales in ways you cannot change on a Tuesday. Prime cost isolates the two costs a manager can actually move this week.

The most common mistake is leaving out the salaried manager, the chef, or the owner's own pay. If someone draws a paycheck for working in the restaurant, that paycheck belongs in labor. Tips paid by customers do not, because they are not your expense.

The prime cost formula

Two formulas, one feeding the other:

  1. Prime cost ($) = COGS + total labor
  2. Prime cost (%) = prime cost ($) ÷ total sales × 100

Use the same period for every input. If labor is a biweekly payroll, do not divide it by a four-week sales total. Most operators compute prime cost monthly from the P&L and, once they trust their counts, weekly from a short inventory and the payroll register. You can run the math by hand or drop the four numbers into the prime cost calculator.

Prime cost benchmarks by restaurant type (2026)

The two sources below publish their own ranges and agree on the main split: full service runs higher than quick service because table service needs more labor per dollar of sales.

Restaurant typeTypical prime costSource
Quick service (QSR)55% to 60%Restaurant365, 7shifts
Fast casual58% to 63%7shifts
Full service (casual dining)60% to 65%Restaurant365, 7shifts
Fine diningOften above 65%7shifts
Any concept, best-in-class55% or lowerFSR Magazine (David Scott Peters)

A few notes on reading the table:

  • Restaurant365 says the prime cost of a "successful, sustainable" restaurant is approximately 60% of total food and beverage sales, with full service at 60% to 65% and quick service at 55% to 60%.
  • 7shifts puts the overall range at 55% to 65% and says that above 65% there is often little left over for rent, utilities, and profit.
  • Restaurant coach David Scott Peters, writing in FSR Magazine, argues the old targets of 65% for full service and 60% for quick service are outdated, and that an independent doing $850,000 or more a year should aim for 55% or lower.

So "good" depends on your concept. A 63% prime cost is fine for a 90-seat full-service restaurant and a problem for a counter-service taqueria.

A worked example: one month at a full-service restaurant

Take an 80-seat full-service restaurant with one location. October 2026 numbers:

InputAmount
Food sales$72,000
Beverage sales$18,000
Total sales$90,000
Beginning inventory (food + beverage + paper)$14,200
Purchases during the month$29,800
Ending inventory$13,600
Hourly wages$16,200
Salaried pay (GM and kitchen manager)$7,800
Employer payroll taxes$2,000
Benefits and workers' comp$1,500

Step by step:

  1. COGS = $14,200 + $29,800 - $13,600 = $30,400 (33.8% of sales)
  2. Total labor = $16,200 + $7,800 + $2,000 + $1,500 = $27,500 (30.6% of sales)
  3. Prime cost = $30,400 + $27,500 = $57,900
  4. Prime cost % = $57,900 ÷ $90,000 = 64.3%

At 64.3% this restaurant sits at the top of the full-service range. It is not losing money on prime cost, but it has little room. Every point of prime cost here is worth $900 a month ($90,000 × 1%), so getting to 62% means finding about $2,100 in combined food and labor savings every month, or growing sales without adding hours.

Notice how the split tells you where to look. Food at 33.8% is on the high side for casual full service, so that is the first place to dig. Labor at 30.6% is in range.

How to bring prime cost down

Prime cost moves when either half moves. Work the bigger gap first.

If COGS is the problem

  • Count inventory weekly, not monthly, so a bad week shows up in seven days instead of thirty. The full method is in how to calculate food cost percentage.
  • Compare theoretical food cost (recipes × items sold) to actual. The gap is waste, portioning, or theft.
  • Reprice or re-portion the five highest-volume items first. Small changes on big sellers beat big changes on slow ones.
  • Check invoices against quoted prices. Vendor price creep is quiet and adds up.

If labor is the problem

  • Schedule to projected sales by daypart instead of copying last week. Most overstaffing happens in the first and last hour of a shift.
  • Watch overtime weekly. A few hours of unplanned overtime across a crew can add a full point.
  • Put salaried managers on the line during slow shifts instead of scheduling an extra hourly body.
  • Compare your number against the ranges in restaurant labor cost percentage by type before you cut. A labor percentage that is already in range does not need surgery.

If both are in range but prime cost is still high

That usually means sales are the problem, not costs. A $90,000 month with the same crew and the same waste becomes a much better prime cost at $100,000. Look at ticket averages, daypart gaps, and your slowest weekday before you cut anything.

How often to check it

Monthly from the P&L is the minimum. Weekly is better because you can still fix the week after next. A weekly prime cost needs three things: a short inventory count every Sunday or Monday, the payroll register for the same seven days, and net sales from your POS for the same seven days. If your POS reporting exports sales by day, the sales side takes minutes; a tool like sales analytics that pulls Clover sales automatically removes the copy-and-paste step. Orqestra was built around exactly this weekly rhythm, but a spreadsheet works too.

Keep a running 13-week trend. One bad week is noise. Three in a row is a problem.

Common mistakes

  • Leaving salaried pay out of labor. It makes prime cost look two to eight points better than it is.
  • Skipping payroll taxes and benefits. Employer taxes alone add several points on top of wages.
  • Using purchases instead of COGS. A big delivery on the 30th inflates one month and flatters the next. Always use beginning inventory + purchases - ending inventory.
  • Mixing periods. Monthly sales divided against a biweekly payroll produces a number that means nothing.
  • Comparing to the wrong benchmark. A quick-service shop at 62% is in trouble. A full-service restaurant at 62% is doing well.
  • Chasing the number with service cuts. Cutting a server on Friday night to hit 60% costs you more in lost covers than it saves. Fix waste and scheduling before you touch service levels.
  • Checking it once a quarter. By the time a quarterly prime cost looks bad, you have already lost the money.